Hisondcs news

          Application and design principles of an integrated automatic stereoscopic Library

          TIME:18-05-31    NUMBER:74

          In automobile manufacturing enterprises, in order to improve the overall capacity, a auto body auto stereo library is set up between welding, coating and assembly to store the "semi-finished product" in the upstream workshop, and the automatic transmission line is connected with the three production workshops to realize the integrated library of the three-dimensional library and the workshop.

          1. On the integrated auto body Library

          In automobile manufacturing enterprises, there are three main production workshops: welding workshop, painting workshop and assembly workshop. In a conditional factory, in order to improve the overall capacity of the whole plant, a auto body auto stereo library can be set up between the three large production workshops to store the "semi-finished product" in the upstream workshop, and the three production workshops are rigidly connected by the automatic transmission line to realize the integrity of the stand storehouse and the workshop.

          1, the application of integrated three-dimensional library body production process.

          After the body is welded in the welding workshop, the body not sprayed can be temporarily stored in the storage area through the transmission line corridor. In order to meet the economy of mass painting, the white body can be rearranged and rearranged according to the color, and then through the corridor into the painting workshop to finish the spraying; also, after the body is sprayed in the painting workshop, the body can be temporarily stored in the reservoir area by the corridor between the painting workshop and the painting workshop; finally, the body can be temporarily stored in the reservoir area; finally, the body can be temporarily stored in the reservoir area; finally, the body can be temporarily stored in the reservoir area; finally, the body can be temporarily stored in the reservoir area; finally, the body can be temporarily stored in the reservoir area; finally, the body can be temporarily stored in the reservoir area; finally, the body can be temporarily stored in the reservoir area; finally, the body can be temporarily stored in the reservoir area; finally, the body can be temporarily stored in the reservoir area; finally, the body can be temporarily stored in the reservoir area. After painting, the body is sorted out again according to the order order of the assembly shop, and then assembled into the assembly shop.

          2. The functions of the integrated stereoscopic Library

          If the integrated stereo library is compared to a reservoir, the production workshop in the upper and lower reaches is compared to the intake pipe and the outlet pipe. It can be seen that the integrated three-dimensional warehouse mainly takes two functions:

          (1) buffer storage to meet the production rhythm difference between the upstream and downstream workshops.

          (2) the re ordering of incoming and downstream can meet the needs of downstream workshop.

          The size of the storage capacity is not only to meet the difference in the production rhythm of the upstream and downstream production workshops, but also to meet the temporary change of the order, so that the capacity of the library has the function of buffer transformation to ensure the normal production. But it is not too big to avoid the waste of the early investment. Therefore, it is always a difficult problem to estimate the reasonable capacity of integrated stereo library.

          Two, the design principle of buffer stock for integrated solid Library

          In the production logistics, there are two main reasons for the temporary storage of WIP. One is the difference between the upstream production workshop and the downstream production workshop; two, the input and output speed of the upstream and downstream production workshops is different. In the design plan, we should consider the two reasons and calculate the corresponding buffer stock respectively.

          Three, the design principle of reordering inventory in integrated solid warehouse.

          In order to balance the contradiction between the flexibility of supplier production and the order change in the assembly shop order, a certain amount of inventory level can be maintained in the reservoir area so as to timely provide the body that meets the requirements of the order. This inventory level is the reordering stock. As with the buffer stock, if the inventory is too high, the equipment investment and daily operation cost will be wasted. The difference is that when the reordering stock is too low, there will be a situation where the inventory is clearly in the order of the original order, but there is no car available because of the failure of the order matching. At present, the most common design principle of reordering inventory is to estimate reasonable reordering stock by creating data models and Simulation of body processes.


          在線客服
          主站蜘蛛池模板: 亚洲国产一区在线观看| 国产一区二区在线观看| 精品国产福利在线观看一区| 国产午夜毛片一区二区三区| 亚洲熟女综合色一区二区三区| 国产在线无码视频一区二区三区 | 精品国产日韩亚洲一区| 精彩视频一区二区三区| 国产一区美女视频| 一区二区三区在线观看免费| 亚洲国产一区视频| 国产色综合一区二区三区| 亚洲国产精品一区二区第一页免| 亚洲AV无码一区二区乱子仑| 国产精品成人一区二区三区| 久久一区二区免费播放| 欲色影视天天一区二区三区色香欲| 成人区人妻精品一区二区不卡| 亚洲国产欧美一区二区三区| 中文字幕AV无码一区二区三区| 亚洲一区在线视频| 日本无卡码一区二区三区| 精品一区二区三区在线视频观看| 国产乱码伦精品一区二区三区麻豆| 精品欧美一区二区在线观看| 成人区人妻精品一区二区三区| 无码中文字幕一区二区三区| 精品久久综合一区二区| 在线精品自拍亚洲第一区| 波多野结衣一区二区免费视频 | 国产一区二区三区露脸| 波多野结衣中文字幕一区| 精品女同一区二区三区在线| 视频在线一区二区三区| 爆乳熟妇一区二区三区| 午夜DV内射一区二区| 在线观看中文字幕一区| 日韩美女视频一区| 久久se精品一区二区影院| 国模大尺度视频一区二区| 亚洲A∨无码一区二区三区|